SPARHAWK SUSTAINABLE HYDRO HYDROGEN ENERGY PILOT PROJECT
-- SHEP --

GOALS & OBJECTIVES

Located in Yarmouth, Maine, Sparhawk dam spans the Royal River. The Sparhawk Mill was originally built to manufacture cotton grain bags from raw cotton using mechanical water power to operate the equipment. The site has been home to Yale Cordage, Cole Hahn, Village Candle, Maine Coffee Roasters, Maine Teddy Bear Factory, and Kepware, a software development company. SHEP will continue this history of innovative startups at the Mill.

This site will be home to the Sparhawk Sustainable Hydro Hydrogen Energy Pilot Project (SHEP), HEC's first commercialization assessment effort. Using the low-head hydro facility now in place, HEC will assess an electrolysis hydrogen production and fuel cell based electricity production system.

From the Bridge Street Dam the river is diverted through a 7' diameter penstock which supplies water to operate three modern (1984) 90 kW tube-type turbines in the sub-basement of a four story brick building at the river's eastern edge. The whole facility is rated at 270 kW, has a FERC exemption license, and operates on a "run of river" basis. Electrical profile is at 480 volt 3 phase 60 hertz; all output interconnected to CMP grid. There are three turbines; Unit #1 and Unit #2 are Hydrolec H9H with adjustable runners and minimum output of 25 kW @ 26cfs, rated 90kW @ 80cfs, Max output 106 kW. Unit #3 is also a Hydrolec H9H but with a fixed runner rated 90kW @ 80 cfs, max output 106kW. Electrical production profile based on 30 years mean flow data for Royal River and historic facility output data.

P. Andre (Andy) Lemaistre, a former owner of Yale Cordage, owns the building. In September of 2000, Andy will start renovating the building into 24,000 square feet of Class A office space. His plan is to provide tenants with heat, air conditioning, common area lighting, and elevator service using electricity generated by the sub-basement turbines. The present design calls for the use of a heat pump system.

Preliminary "guessimates" suggest the turbines can produce 4-times the power required for these purposes, on an annual basis. However, the river is subject to significant seasonal water level variation and runs too slowly to provide any power at all during much of July and August and at isolated times during other seasons. High stand-by fees mitigate against using grid power to supplement on-site power during low-water periods. This presents an opportunity to assess the feasibility of making electrolysis hydrogen when the river is high, evaluating various methods for storing that hydrogen, and using a hydrogen fuel cell to generate the building's HVAC and common area electricity when the river is low. Electricity for individual tenant's needs will be supplied from the grid unless the tenant opts to purchase un-interruptible, high quality fuel cell power from HEC.

Early review has indicated that storing enough hydrogen for an entire two to three months is not be feasible from a cost, safety, and space standpoint. The mill will stay connected to the grid to supply power during times of low flow. Being connected to the grid opens the door to demonstrating hydrogen's potential as a grid load leveler. Hydrogen will be made from the grid during off-peak hours and electric energy will be supplied to the grid and office complex during on-peak hours. During off-peak hours, while hydrogen is being made, the building electricity will be supplied by the grid and fuel cell acting as back-up for one another. Control systems will need to be designed which handle the complex switching requirements of this aspect of SHEP.

Neither the building owner nor HEC expects electricity produced this way to be cheaper than grid power, even allowing for the stand-by charge. HEC does expect to learn enough from the project to make future iterations of the system economically viable at this site and at the large number of similar low head hydro sites throughout New England and in river-rich developing nations. While the building owner is supportive of HEC's objectives, he cannot fund the anticipated negative cost differential. Consequently, government, foundation, or corporate grants will be required to fund the design, engineering, purchase and installation of the hydrogen-based power production system.

The remaining products and services of which SHEP is comprised will be designed with two purposes in mind. First, to offset the per kilowatt hour cost of electricity generated by the electrolyzer/fuel cell system. Second, to assess the stand-alone commercial viability of these products and services.

SHEP's additional products and services may include:

In order to proceed, HEC and the building owner need certain basic engineering data and assistance with project cost estimates. Bennett Engineering of Freeport Maine, who prepared the 1992 renovation plans for the building, has provided detailed monthly/weekly power use estimates for the landlord-provided electricity in the building as it will be renovated. This allows us to provide a fairly precise idea of the amount of "excess" power available in certain weeks and the "deficit" amount we'll have to make up in other weeks.

From this data, the amount of power available for the "additional products and services" list can be calculated and, in-turn, the amount of hydrogen and oxygen we could theoretically generate each month/week can be calculated. From that data, the size and price of electrolyzers, storage devices, fuel cells, compressing and filling equipment, etc. can be calculated and then a more realistic estimate of the output levels can be prepared.

Once this rough data is available, a total project cost and time line report will be prepared. The list of possible services and products will be refined and the best funding sources for the final project configuration identified and engaged.

Return to first SHEP page | Home | About

The Hydrogen Energy Center is a Maine based 501(c)(3) non-profit corporation whose mission is to shape and accelerate the worldwide transition to a hydrogen energy economy. All donations are tax deductible. Please go to /support.htm to offer your support for this project in particular or hydrogen in general. Thank you.

Your questions, comments or suggestions are both eagerly sought and entirely welcome.