THE KENNEBEC RIVER CARLTON BRIDGE
ALTERNATIVE POWER AND HYDROGEN GENERATION
DEMONSTRATION PROJECT
ENGINEERING FEASIBILITY STUDY
"THE HYDROGEN BRIDGE PROJECT"
City of Bath, Maine
John W. James IV, Councilor,
55 Front Street, Bath, ME 04530 / 207-443-3833
(Municipality)
The Hydrogen Center
Richard Smith, President
477 Congress St., Portland, ME 04101 / 207-871-5080
(a Maine non-profit corporation)
Confirmed Match Partners:
Lawrence Livermore Laboratories (non-profit)
Stone and Webster, Power Division (for profit)
Northeastern University, Dept. of Mech., Indust. and Mfgr. Engineering
Environment & Energy Center, an affiliate of Maine Chamber and Business Alliance, (non-profit)
Mid-Coast Council for Business Development (non-profit)
The Hydrogen Center (non-profit)
City of Bath, Maine (municipal)
Maine Science & Technology Foundation (non-profit)
Project Abstract
Numerous local, state and national organizations and corporations have agreed to collaborate to design and build the nation's first bridge-mounted, non-dammed electric generation facility to generate hydrogen for transportation, fuel cells and local industry . Each of the three potential sources of electric power generation: submerged helical turbines, bridge-mounted photovoltaic cells and, possibly, wind turbines, would provide renewable, sustainable "green" power to nearby municipal and private vehicles, buildings and industry, create the availability of locally-produced "green" hydrogen for use in stationary and vehicular fuel cells, and provide the raw materials for new types of environmentally-friendly consumer-ready hydrogen products including hydrogen 'small-packs' for powering residential and light industrial mobile and hand-operated machinery.
The project partners are requesting $175,000 for an engineering feasibility study, with an additional $94,000 to be matched by local, regional and state partners, which represents a 35% share of a total project cost of $269,000.
Project Narrative
Background:
Bath, Maine, has one of New England's largest and fastest-flowing rivers as its waterfront, yet has, to date, been unable to take advantage of its potential. A large, new, $74 million fixed-span bridge currently under construction and due for completion in 2000, will leave a smaller, lift bridge (the Carlton Bridge) unused, except for occasional rail traffic. It is this vacant bridge, like hundreds in the nation, that stands as a centerpiece for this project.
Bath is home to Maine's largest private employer, the Bath Iron Works (BIW), whose 7,900 employees commute in and out of the city's small downtown, creating sizeable traffic jams and occupying mostly private parking lots scattered throughout a half-mile square area. The opportunity to improve this situation and the potential sale of both electricity and gasses to BIW and other local and regional businesses, offers considerable long-term economic and environmental sustainability.
· Project Goals:
... to demonstrate the feasibility of using the Carlton Bridge as a site for the future generation of electricity and the manufacturing of hydrogen and oxygen to provide renewable sustainable "green" power.
... to develop an implementation plan to include financial package and regulatory direction in order to create the alternative power and hydrogen generation facility.
This innovative project addresses the objectives of the Sustainable Development Challenge Grant Program. It represents a significant public and private partnering to the problem of increased consumption of fossil fuels for energy and transportation.
The project encompasses both environmental and economic approaches leading to the opportunity of the protection of ecological and economic health in the Mid-Coast region.
The project has drawn together the cooperation and involvement of residents, businesses, non-profit organizations, an educational institution, and local government.
The scope of the project involves building a network and a partnership to develop and share information from the feasibility study which will promote sustainable development.
The project combines approaches which can contribute to the protection of the environment, maintain the viability of the Mid-Coast community, and help sustain economic growth, which will provide long term benefits.
· Project Tasks
The Project involves a four phase program. The first phase will undertake an engineering feasibility study and analysis. The second phase will develop an implementation plan to be carried out by the sponsors in conjunction with the partners. Please note commitment letters from the partners in the attachments.
Phase 1 Tasks
1. Conduct a engineering feasibility study of using the Carlton Bridge for the generation of electricity and the manufacturing of hydrogen and oxygen. The technical aspects include:
B. Determine the amount of electric power, hydrogen and oxygen that can be generated from each renewable energy source using alternative electrolysis and other hydrogen and oxygen generating technologies.
C. Determine the proper location and orientation for the helical turbines given navigation, bridge structure, new river filling project, fish migration, and other considerations. More generally assess the reliability and efficiency of the new helical turbine technology.
D. Determine the load capacities, stresses, and maintenance and repair impact on the bridge structure associated with mounting the PV array, wind generators and the helical turbines.
The study will be conducted by an engineering firm working with the Project Team (including the City of Bath, the Hydrogen Center, and Northeastern University.) Qualified and interested engineering firms have been identified including: Bechtel, Stone and Webster, and CMPOS EPROL.
2. A second dimension of the feasibility study will be to analyze the potential for and methods of distributing the renewable sustainable "green" power generated by the project. These methods include distributing to nearby municipal and private vehicles, buildings, and industry, to create the availability of locally produced "green" hydrogen for use in stationary and vehicular fuel cells, and to provide the raw materials for a new local environmentally friendly industry packaging and distributing hydrogen.
The technological aspect of this part of the study will include:
A. Explore alternative ownership structures for construction and operation of the facility in the post-grant period.
B. Explore market considerations including:
· A determination of the number of local electrical power users who would consider paying a per kilowatt "premium" for "green" power generated from the bridge.
· A consideration of the possibility of equity participation by rate payers in the hydrogen and oxygen distribution related enterprises.
· A determination of local market price elasticity for existing industrial hydrogen and oxygen users.
The Project Team has already begun to identify interested municipalities, businesses, and industries. In addition, the Project Team has already designed a preliminary concept for the creation of a local for-profit environmentally friendly business to package and distribute hydrogen energy produced through the project.
3. A third task for the feasibility study will be the design of the implementation plan, which will include identification of the financing packaging and regulatory issues resolution in order for future development of the alternative power and hydrogen facility.
4. The final task of the first phase will be production of the feasibility study/implementation and its presentation and/or dissemination to all interested parties including the EPA.
Confirmed Partners
· City of Bath, Maine - John W. James IV, Councilor - 207-443-3833 - Municipality
· The Hydrogen Center - Richard W. Smith, President - 207-871-5080 - Non-Profit
· Northeastern University - Alexander M. Gorlov, Professor and Director, Hydro-Pneumatic Power Laboratory - 617-373-2983 - Educational
· Lawrence Livermore National Laboratory - Woodrow Clark, Strategic Initiatives Engineering Directorate - University of California - 925-424-6159 - Non-Profit
· Maine Environment & Energy Center - Suzanne Watson, Director - Maine Chamber and Business Alliance - 207-775-1200 - Non-Profit
· MidCoast Council for Business Development - Michael A. Duguay, Executive Director - 207-729-0144 - Non-Profit
· Maine Science & Technology Foundation - David Patch, Director, Industry Development - 207-621-6350 - Non-Profit
· Stone and Webster - Shirley Williamson, Hydro Business Sector Manager - 617-589-5111 - For Profit
Relationship of Project to Selection Criteria
Sustainability:
)This project integrates environmental protection, economic prosperity and community wellbeing by using a local, renewable, sustainable resource to provide clean fuels and power to the local community. In particular, the constant flow of a tidal river will be converted to electricity for use at the Bath Iron Works (BIW), and to manufacture zero emission hydrogen for use by commuter and mass transit vehicles, by BIW welding operations, by area hospitals, and for clean fuel vehicle initiatives, and zero emission oxygen by BIW welding operation and by area hospitals. In addition to being a source of clean, sustainable electricity, hydrogen, and oxygen, the resulting facility will become a working "laboratory" and testing facility for future developments in fuel cell, electrolyzer, photo-voltaic cell and wind generator design. This facility will attract new business and create new high technology jobs for the local community and the region.
)By steering away from fossil fuel use, the project converts the non-sustainable behavior of using electricity and industrial gasses generated by coal, oil and natural gas, to the sustainable behavior of using these products made from solar, wind and river current flow resources, all of which are sustainable.
)The larger ecosystem: Hydrogen lies at the core of the long-term energy future of the United States. It answers the problems of air pollution in both the production and consumption of energy. This project will allow us to reach a hydrogen-based economy sooner. While this is a relatively small project, it is a model that demonstrates the broad-based feasibility of totally clean energy, and therefore, benefits not just a significant percentage of the population, but the entire population.
)The economic activities of which this project is the harbinger, use completely inexhaustible resources and produce no pollution or other environmental degradation.
)Fossil fuel use in Maine is more closely tied to Middle-East oil than in any other area in the country. By producing transportation fuels and electricity with local jobs and local, inexhaustible "raw materials," the jobs created are, by definition, sustained indefinitely, and the money now sent overseas would be retained locally. This solution does not require shifting the burden to other areas or to a new source of pollution. It is a completely clean, domestic, job-creating, sustainable system.
)The Kennebec River has long been used to generate power, although not at the project site. Those other project sites have required the construction of dams, which block the river's flow and create other adverse environmental impacts. This project will demonstrate a new solution by generating power from the river's flow without the need for a dam. Similarly, the wind and solar resources long-indigenous to the area, have gone untapped for lack of an appropriate site close to the users of their power. This project supplies a unique solution to that problem. Clean Air EPA Standards have not been successfully met by the State of Maine. The transfer from fossil to "green" fuel, conducted under proactive, rather than regulatory pressures, will provide the state with incentive-based protocols in its quest to comply.
Community Commitment and Contribution:
.This project's partners represent private citizens, municipalities, industrialists, environmentalists, workers, commuters and academics from the "local" community of Bath, as well as the communities of the Kennebec River watershed, and the citizens and businesses of the entire state. Each of these groups will benefit from this feasibility study because they will be able to use the results to create pollution-free, sustainable, long-term transportation networks, electricity supplies, new fuels and a new, local, energy industry. The results of this study will include market analysis, financing alternatives, and defining very specific implementation strategies.
.Each of these groups will benefit from the feasibility study and the implementation plan, because they will be able to use the results
.As a municipality, the City of Bath has in place a long-standing history of municipally directed public participation forums including neighborhood meetings, public hearings, council workshops and a standing citizen advisory committee representing a complete cross-section of the community. All of these forms of citizen involvement will be an integral part of this study's process.
.As described elsewhere in the application, this project has strong support enabling us to offer over a 30% match. (Please refer to the budget included in this application, and to the attached letters.) Part of the work proposed includes the identification of those Federal, State, and local regulatory issues that will have to be addressed in order to construct the facility that the project anticipates. This project anticipates the construction of a facility which will produce power for decades to come. All of the project partners and the community in general are committed to bringing long-term, clean power to the area. Sustainable energy is, by definition, a long-term commitment.
Measurable Results:
.As this project describes the feasibility/implementation plan, it will also address numerous environmental, economic, and quality of life benefits for the surrounding communities. For example: clean-fuel powered busses and vans will go a long way toward cleaning up noise and air pollution and traffic congestion. Quality of life is thereby increased significantly, as is overall public safety. Since BIW already has commuter van pools, a good and simple measure of behavioral changes would be the number of vans converted to "green" power. The same is true with respect to the general vehicle population. It is also true with respect to the number of households that choose to use hydrogen fuel cells, and the number of industrial customers who switch from non-sustainable-derived hydrogen and oxygen, to hydrogen and oxygen produced by the facility that is the subject of this proposal.
.Many communities recognize the connection between environmental protection and their own prosperity and well-being. This proposal allows our community to determine the feasibility of making that connection in a very specific way. Because the study includes financing, regulatory and market feasibility studies, the next steps toward implementation are made clear. The results can be measured by the frequency with which the feasibility study is used to support funding applications by producers and consumers of the electricity and gasses generated. The substantial community support for this study and interest from the financial community, give the applicants cause to believe that construction of the facility, that is the subject of this proposal, is highly likely, unless the engineering feasibility study discloses unforeseen difficulties. With respect to the study itself, the contribution to the community can be measured as certain benchmarks within the study's "Budget Narrative" are reached. (Please see page 8) A key benchmark is the preliminary determination of how much power can be generated from each of the three sustainable sources.
.The project's two main goals of completing the feasibility study and establishing an implementation plan will allow the pro-active environmental approaches for alternative energy use to be attained in the future.
.After seed funds from EPA are exhausted, a large number of entities will be working toward sustainable production and consumption methods. In particular, (i) a non-utility generator is interested in marketing the "green" (renewable-sustainable) electricity to consumers and industrial users in the post-de-regulation environment., (ii) a subsidiary of the Hydrogen Center has identified industrial users of hydrogen in Maine whose corporate missions include increasing the use of sustainable domestic fuels, (iii) RPR, a Maine corporation, has identified users of argon-free oxygen who are likely customers of the oxygen that will be generated as part of the hydrogen manufacturing process, (iv) a regional industrialist has expressed an interest in creating new local jobs by manufacturing the helical turbines for this project and similar projects elsewhere in the country.
.RJD Associates of Port Ewing, New York has initially identified two dozen bridges around the country that are similar to the one in Bath in that they are being replaced by new bridges, but not being torn down. Many of the communities adjacent to these bridges will be able to use the results of this feasibility study, thus multiplying the benefits of any federal dollars committed.
.Project success means a determination that the use of the bridge as described is, in fact, feasible from an environmental, economic and regulatory point of view, as measured against a detailed implementation plan. In addition, success will be measured by the increased involvement and commitment of the "project team" partners and by the number of new partners attracted. Each project contractor and sub-contractor will be required to submit monthly progress reports in writing to the Bath City Manager. These results will be reviewed by the Bath City Council, with specific direction provided by a Project Evaluation Committee comprised of one representative from each "match partner" category and one representative of the EPA, if desired, or a designee. This committee will compare the results reported by each contractor with the project tasks and budget narrative tasks listed in this proposal. In the event that the required tasks are not being accomplished or in the event that the results to date suggest the need for modifying the original tasks, the Committee will recommend to the City Council that amendments to the contract(s) be prepared. In the event that such task changes are required, EPA will be notified immediately to assure that the original purposes of the grant are maintained.
Schedule
Project team continues to meet: January 1, 1999 - March 1999
Prepare and submit addition funding requests: Jan 1, 1999
Prepare scene of services for Engineer /advertise: February 1, 1999
Engineer selected contract subject to award: February 15, 1999
Project selected: March 1999
Full application submitted to EPA: May 1999
Feasibility study Task 1 completed: July 30, 1999
Feasibility study Task 2 completed: August 30, 1999
Development Plan Task 3 completed: October 1, 1999
Presentation and Distribution: October 15, 1999 - December 15, 1999
Feasibility Study/Development Plan Task 4: October 15, 1999 - December 15, 1999
Implementation phase begins: January 2, 2000
Budget Summary
EPA Share Matching Funds Total
Engineering/Consultant $140,000 $50,000 $190,000
Equipment 20,000 20,000 40,000
Printing (study plan) 0 5,000 5,000
Supplies 0 4,000 4,000
Postage 0 2,000 2,000
Travel 5,000 2,000 7,000
Audit 0 1,000 1,000
Project Coordination 10,000 10,000 20,000
TOTALS $175,000 $94,000 $269,000
Break-Down of (in-kind) Matching Funds
· City of Bath: $10,000
· The Hydrogen Center: $32,000
· Northeastern University: $40,000
· Lawrence Livermore Laboratories: $6,000
· Environment and Energy Center: $2,000
· MidCoast Council for Business Development: $2,000
· Maine Science & Technology Foundation: $2,000
Budget Narrative
· Examination of suitable water flow sites for installation of helical turbine: $2,00
· Design configuration plan of multiple turbine installation: $3,000
· Composition of conceptual drawings: $3,000
· Power and structural analysis of the turbine arrays: $15,000
· Procurement of power and test equipment: $10,000
· Construction, monitoring and assessment of a small turbine array: $20,000
· Determine design modification required, if any, for slower incoming tidal flow: $5.000
· Creation of mathematical model for determining effect on river flow of planned river filling project at Bath Iron Works immediately downstream from the project area and construction of new vehicle bridge upstream from the project: $20,000
· Assessment of impact of project elements on structural integrity of the underwater portions of the current bridge structure including assessment of the sufficiency of existing maintenance and repair schedules and budgets: $30,000
· Examination of suitable locations on the bridge structure for erecting photovoltaic arrays and wind generators: $3,000
· Selecting optimal wind generator and PV Array designs: $5,000
· Power analysis and structural analysis of Wind and PV Arrays: $10,000
· Evaluation of alternative electrolyser technologies currently available and calculation of hydrogen and oxygen output from each of the three power sources: $5,000
· Evaluation of the suitability of alternative hydrogen and oxygen storage technologies currently available and calculate storage capacity for units if constructed on the bridge: $5,000
· Power analysis: $5,000
· Analysis of impact of construction of electrolyser, hydrogen, and oxygen storage facilities and fuel cells on the structural integrity of the bridge including a comparative examination of possible off-bridge sites for construction of these components: $15,000
· Prepare conceptual drawing of hydrogen and oxygen storage facility and fuel cell power generation facility: $5,000
· Analysis of State, Federal and Local permitting and Fire and Safety Code requirements for installation of each component included in the project study: $5,000
· Local market analysis to identify additional users of hydrogen, oxygen and electricity, including a determination of what premium, if any, those users would pay for renewable resource produced electricity, hydrogen and oxygen: $10,000
· Determine the availability of contracts for the use of the existing electric utility transmission system to wheel power from the bridge facility including an assessment of the impact of the deregulation of the electric utility industry: $2,000
· Determine whether written commitments can be obtained from end-users to purchase electricity, oxygen, and hydrogen produced at the bridge site: $3,000
· Determine the availability of financing alternatives for construction and operation of the facility based on end user interest: $2,000
· Obtain coordination and use commitments from existing area public projects and entities currently implementing prior study recommendations to encourage clean fuel vehicle fleets and promote the use of fuel cells in the Mid-Coast Region: $2,000
· Prepare final report: $5,000
· Purpose of power and testing equipment: $20,000
Project Results/Evaluation Plan
The feasibility study will result in a document prepared by the engineers and project consultants, analysis by the Project Team and printed for public distribution.
The implementation plan will also result in a document prepared by the project consultant and the Project Team and printed for public distribution.
For project evaluation see Measurable Results: #5 pg. 6
For project to sustainability see Sustainability # 1-5 pg. 4 & 5
For tracking project performance see Measurable Results # 1-5 pg. 5 & 6
Attachments
· The Hydrogen Center - Secretary of State certification as a duly organized non-profit organization, State of Maine
· Letters of commitment documenting financial and in-kind services